Installation of approximately 5.8km of PVC pressurized pipe line with the associated valves and fittings, along with rehabilitation and retrofitting of a 40ft container to serve as control centre, restroom and storage facilities completed with the installation of a 2500 GPM water pump and switch gear along with the construction of 3KM of high voltage (HV) pole line.