The Object Of The Contract Is The Execution Of The Works That Include The "Constructive Project To Improve The Drinking Water Transport Network From The Molí Del Blanquillo To Vendrell Deposit" Drawn Up By Dengvial, S.L., As Well As The Services Of Facultative Management And Health And Safety Coordination In The Work Corresponding To This Work. It Is Therefore A Mixed Contract For Works And Services, Where The Main Provision Is The Work Of The Project Mentioned In The Previous Paragraph. Object Of The Work: The Objectives Of The Improvement Of The Transport Network From The Molí Del Blanquillo Reservoir In The Municipality Of Vendrell Are The Replacement Of The Two Pipes That Currently Transport Water From This Reservoir To Vendrell. The First Has Its Route Through The Interior Of The Riera De La Bisbal And The Second Has Its Route Along Camí Dels Molins. The Two Pipes Are Currently Fiber Cement And Will Be Replaced By Ductile Iron. Object Of The Services: Together With The Works, The Technical Intervention Services That Are Needed To Carry Out The Improvement Works Of The Transport Network Must Be Contracted, Specifically The Services Of The Facultative Management Of The Works (Df) And The Coordination Of Safety And Health At Work (Css).